Monday, December 12, 2011

Solstice pups: Airedales

Kat has had a nice litter of pups that will be weaned just in time for Solstice. 
 She's a little camera shy, but soon warms up.  Cup in the picture for reference. 

 There are 10 pups, 6 boys and 4 girls.    eyes are open and they're eating food.  A whole pile of puppies. 
Soon to be under a tree near you! 

Sunday, December 11, 2011

Natures harmony farm stops podcasting

A few years ago I ran into a blog that I liked quite a bit; natures harmony seemed like just the sort of thing that I liked to read.  Animal-centered, with a plain style and dealing with some of the topics that I'm interested in reading.  Animals for food, with a homesteading sort of bent. 

Some of their content was particularly good.  Their turkey slaughter video is one of the best that I'd seen to date, and I liked that they seemed to be interested in experimenting with their farm.  It's interesting to me to see people try new things, and to succeed, and fail. 

Every now and then Tim would wander over to my blog, and he'd comment on his blog about something I was doing, and I'd do the same; we have no connection and are farms are thousands of miles apart, but it was interesting to see his viewpoint -- which could be pretty extreme at times.   It was annoying that Tim would start a controversial subject, and then ban everyone who disagreed with him, and it happened to me, too.  I forget what I got banned about... I think he posted a topic asking whether chicken tractors were inhumane, and I responded that fences on cow pastures must be, too.  That got me banned. 

Over the last year or two they've chosen to go in a direction that hasn't been very interesting to me;  they've been busy shrinking their farming business; reducing their production of pigs to personal use levels, and chickens, and giving away their equipment.

I had to laugh when they were talking about spending more time with each other and Tim chose the hardest type of farming, in my opinion -- dairy. It's a relentless, 365 day a year job that allows no vacations, no sick time and is not really a social activity.   Maybe the cheese tastings will make up for it.  Dunno. 

At this point I'm not really sure what they're selling.  Their webpage has items that I know are no longer for sale. 

One thing that I'll give them credit for is calling an end to things.  A lot of blogs and podcasts just stop recording;  Tim and Liz have made a formal end to each of their endeavors; the blog, the podcast, and I suspect at some point they'll call an end to their farm, but I enjoyed them while they were here. 

Natures harmony blog
Natures harmony podcast

Thank you, Tim and Liz. 

slab talk: Gravel layers and "thickened" slabs

Working on the slab, here's the progression for today.  Below you'll find a picture of the recycled concrete base layer.  Pretty big chunks.  We'll use that to bring the base to a few inches of the desired gravel level.   
You can really only get as close to the level desired as the size of the rock.  so if you're using 2-4, it's pretty hard to get closer than 4".  So the next layer is 2"  clear, which is much smaller and more uniform.  Using that I can get within 2" of the desired level.  (yes, you can do a lot of work to get it smoothed down and really pound it into the ground, but that's a lot of labor.  )
Here's the same area, now with layer of 2" rock on it.   It's within an inch of the desired grade.  I'm working hard on getting the grade right because concrete is very expensive -- about $80/yard, delivered.  Crushed stone is $13/yard.  An extra 1 inch of depth would cost me $640 -- for every inch! 
The next step will be to put an even smaller crushed rock in the center of the slab, raising the center of the gravel 2" or so. 
What the picture above shows you is two slabs.  For this particular project, I don't need the entire slab to be 6" thick; I need the edges of the slab to be strong, strong enough that they can support 10,000lbs of ecology blocks, and I need the edges not to crack under the weight of the tractor, that weighs 12,000lbs.  But the center of the slab won't need to be that strong -- 4" of reinforced concrete with a well-compacted base should be just fine.

So my first step is to level the entire site with the gravel, and then I'll add 2" of height in the center of the slab, and by doing so reduce the total amount of concrete that I need by close to 9 yards -- a whole concrete truck.  Doing the math it reduces my cost about $650, net.

You can do this sort of thing if your grade is very good.  When I'm done I'll be within 1/4" tolerance on my grade.  If I wasn't sure about my grade, I'd go thicker just on general principle.

Too many people grade with concrete.  Sure, it works, but it's a terribly expensive way to fill a hole.  Gravel is pretty easy to work with, and much cheaper.  

Just a note:  For each size of gravel laid I'm carefully spreading it, measuring it with the laser level, and then running the compactor on it.  So every inch of this gravel will have had at least 3 compactor runs over it before I'm done.